School Road, Branston

CUSTOMER

Nurton Developments Ltd

CONTRACT TYPE

JCT Design & Build

CONTRACT VALUE

£2.89m

KEY PROJECT ELEMENTS

Chasetown Civil Engineering was awarded a £2.89m contract by Nurton Developments to deliver earthworks, roads, and sewers for 500m of roadway. The infrastructure was crucial for public access to a new primary school that was under construction and a future 2,000-home development, with Chasetown opening the road ahead of schedule for school opening. The scope included deep sewer construction, road and footpath development, stormwater management, and coordination with multiple stakeholders to maintain access throughout the works.

The project presented unique challenges, including sewer construction at depths of up to 6m within a high water table, requiring de-watering operations and sheet piling. Chasetown also managed complex connections to Severn Trent Water assets at full flow, necessitating over-pumping at significant depths. Sustainability was a priority, with silent pumps and gully bags deployed to reduce environmental impact, along with recycled materials used for road capping. Collaboration with adjacent contractors and residents was critical, ensuring smooth interfaces and minimal disruption throughout the programme.

Health and safety were paramount, with Chasetown achieving Zero Harm and ensuring rigorous daily safety reporting. The team’s expertise in managing challenging ground conditions, utilities coordination, and stakeholder communication ensured all elements of the project were delivered to the highest standards. Innovations such as Easi-Bases for manhole construction and expanding foam for jointing supported efficient and high-quality delivery. Chasetown demonstrated their collaborative approach, adapting methodology and accelerating phases of works to mitigate potential delays to meet key milestones.

The project demonstrated Chasetown Civil Engineering’s ability to deliver under pressure while maintaining quality, sustainability, and safety. From seamless coordination with the school construction to innovative problem-solving during drainage installations, the team showcased their expertise in complex infrastructure projects. This successful delivery reinforces Chasetown’s reputation as a trusted partner for high-stakes, community-focused developments.

FEATURED PROJECTS

We Build Projects That Create Legacies

Norwood 18.04.2024-9597.jpg

Norwood

Relief Road

663 School Road, Branston (006).jpg

School Road 

Branston

IMG_9160.heic

Priorslee

Telford

100_0046_0023.JPG

Bourne Street

Wolverhampton

OUR CLIENTS

We Believe Every Client Is a Valuable Long-Term Partner

bottom of page